Most w m. Świrna

Road bridge in Świrna. The structure consisted of prefabricated upper elements of the ABM ARCH system founded on monolithic supports.

  • Most drogowy:
  • Type of construction: ABM ARCH
  • Type: Road
  • Assembly time:1 dzień
  • Horizontal light:8,05 m
  • Length:28,49 m
Download the property card

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME
ABM TWIN WING
+48 787 628 402
mosty@abmeurope.com