LCS Kutno - Barłogi

Railway bridge made of prefabricated elements of the ABM FRAME system. The structures were assembled with increased mobilisation, and the assembly lasted continuously for 26.5 hours. During this time, the entire structure, including the retaining walls, was assembled.

  • km 162+870:
  • Type of construction: ABM FRAME
  • Type: Railway
  • Assembly time:1 dzień
  • Horizontal light:10 m
  • Length:10 m