LK 107 Łupków

The railway viaduct was constructed using ABM ARCH prefabricated elements. The structure was under the protection of the conservator of monuments, and the local authorities required that the new structure replicate the original 150-year-old construction. To this end, the surface of the prefabricated elements was rusticated to imitate stone blocks. In the centre of the viaduct, there is a decorative concrete texture that harmonises with the stone finish of the front walls of the structure.

  • km 34+263:
  • Type of construction: ABM ARCH
  • Type: Railway
  • Assembly time:1 dzień
  • Horizontal light:7,0 m
  • Length:6,14 m