LK E20 Warszawa – Mińsk Mazowiecki

Two underpasses at km 0.615 and 7.775. Each structure consisted of prefabricated elements of the ABM FRAME system. The structures were assembled in two halves, while maintaining railway traffic.

  • km 0+615, km 7+557:
  • Type of construction: ABM FRAME
  • Type: Railway
  • Assembly time:2 dni / obiekt
  • Horizontal light:5,5 - 6 m
  • Length:10 - 12,5 m
Download the property card

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME
ABM TWIN WING
+48 787 628 402
mosty@abmeurope.com