Obwodnica Poręby i Zawiercia

The PR-T structure above the oxygen pipeline was constructed using prefabricated vaults from the ABM ARCH system.

  • PR-T:
  • Type of construction: ABM ARCH
  • Type: Road
  • Assembly time:2 dni
  • Horizontal light:5,9 m
  • Length:65,2 m

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME
ABM TWIN WING
+48 787 628 402
mosty@abmeurope.com