S19 Lublin - Lubartów
Two animal passages, PZGd-16 and PZGd-17, two railway tunnels, T-12 and T-22, and a road viaduct, WS-25. Each of the structures was made of prefabricated elements of the ABM ARCH system.
- PZGd-16:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:10 dni
- Horizontal light:15,8 m
- Length:81,82 m
- PZGd-17:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:5 dni
- Horizontal light:19,5 m
- Length:51,44 m
- T-12:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:10 dni
- Horizontal light:16,6 m
- Length:100,4 m
- T-22:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:12 dni
- Horizontal light:8,44 m
- Length:194,98 m
- WS-25:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:5 dni
- Horizontal light:14,01 m
- Length:43,72 m