S6 Sianów - Sławno

As part of this investment, a two-span upper passage for animals and a road viaduct were built using prefabricated elements from the ABM ARCH system, as well as one structure made of prefabricated bolts from the ABM FRAME system.

  • WE-5:
  • Type of construction: ABM ARCH
  • Type: Road
  • Assembly time:10 dni
  • Horizontal light:32,2 m
  • Length:50,8 m
  • WS-6:
  • Type of construction: ABM ARCH
  • Type: Road
  • Assembly time:5 dni
  • Horizontal light:15,5 m
  • Length:42,65 m
  • ES-4a:
  • Type of construction: ABM FRAME
  • Type: Road
  • Assembly time:2 dni
  • Horizontal light:6 m
  • Length:32,61 m

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME