S6 Sianów - Sławno
As part of this investment, a two-span upper passage for animals and a road viaduct were built using prefabricated elements from the ABM ARCH system, as well as one structure made of prefabricated bolts from the ABM FRAME system.
- WE-5:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:10 dni
- Horizontal light:32,2 m
- Length:50,8 m
- WS-6:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:5 dni
- Horizontal light:15,5 m
- Length:42,65 m
- ES-4a:
- Type of construction: ABM FRAME
- Type: Road
- Assembly time:2 dni
- Horizontal light:6 m
- Length:32,61 m