S61 Łomża

PZGd-9 animal crossing. The structure was made of prefabricated arches, side walls and retaining walls from the ABM ARCH system. Despite difficulties in the form of unfavourable weather conditions and the location of a 400 kV power line near the structure, it was installed according to schedule.

  • PZGd-9:
  • Type of construction: ABM ARCH
  • Type: Road
  • Assembly time:10 dni
  • Horizontal light:20,61 m
  • Length:81,66 m

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME
ABM TWIN WING
+48 787 628 402
mosty@abmeurope.com